Experts & Events PlatformKing Abdulaziz Center for Cultural Communication
العربية

Verify a certificate

Check that a certificate was really issued by the Center: scan its code or type the verification code printed on it.

Optional, such as KACCC-2026-029001.

Printed under the QR code, such as GYJ5-UL85-NH3L-N7BF.

Demo: GYJ5-UL85-NH3L-N7BF is valid, SE6H-RXWU-64BE-7PVU was reissued, TWC8-KN6S-WFUN-9B3V was revoked.

No certificate matches these details

Check the verification code printed on the certificate or sent with it.

For institutions: the same result is available as JSON from the verification API.

Demo: other states of this page
Links to every state a visitor can meet, for trying out only.

Choose a guided tour

Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.