Verify a certificate
Check that a certificate was really issued by the Center: scan its code or type the verification code printed on it.
Superseded certificate
This certificate was replaced by a new one on 16 October 2026 and is no longer valid.
The new certificate: KACCC-2026-029016- Holder
- Abeer Alfaifi
- Type
- Certificate of attendance
- Event
- International Coexistence Conference — edition 3
- Event date
- 10 October 2026
- Issued by
- King Abdulaziz Center for Cultural Communication
- Certificate number
- KACCC-2026-029004
- Issue date
- 13 October 2026
- Training hours
- —

Certificate of attendance
Certificate of Attendance
The King Abdulaziz Center for Cultural Communication certifies that
Abeer Alfaifi
attended “International Coexistence Conference — edition 3” held on 2026-10-10.
Dr. Abdullah bin Fahad AllheidanSecretary-General
KACCC-2026-0290042026-10-13Date of issue
For institutions: the same result is available as JSON from the verification API.
Demo: other states of this page
Links to every state a visitor can meet, for trying out only.