Experts & Events PlatformKing Abdulaziz Center for Cultural Communication
العربية

Verify a certificate

Check that a certificate was really issued by the Center: scan its code or type the verification code printed on it.

Optional, such as KACCC-2026-029001.

Printed under the QR code, such as GYJ5-UL85-NH3L-N7BF.

Demo: GYJ5-UL85-NH3L-N7BF is valid, SE6H-RXWU-64BE-7PVU was reissued, TWC8-KN6S-WFUN-9B3V was revoked.

Valid certificate

This certificate was issued by the Center to the name and event below.

Holder
Sultan Al Saud
Type
Certificate of attendance
Event
International Coexistence Conference — edition 3
Event date
10 October 2026
Issued by
King Abdulaziz Center for Cultural Communication
Certificate number
KACCC-2026-029001
Issue date
13 October 2026
Training hours
—
Certificate of attendance

Certificate of Attendance

The King Abdulaziz Center for Cultural Communication certifies that

Sultan Al Saud

attended “International Coexistence Conference — edition 3” held on 2026-10-10.

Dr. Abdullah bin Fahad AllheidanSecretary-General
KACCC-2026-029001
2026-10-13Date of issue

For institutions: the same result is available as JSON from the verification API.

Demo: other states of this page
Links to every state a visitor can meet, for trying out only.

Choose a guided tour

Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.