Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
Owner confirmations per period and the up-to-date rate at period end
Data is up to date if its owner confirmed it within the last 12 months. Staff edits do not count.
The report is sent automatically on time, and generated for each recipient with their own scope and permissions.