Accepted
79
One rule, applied to issuing, downloads and the portal.
Issuing opens after the event ends on 19 October 2026. This is the eligibility so far.
Waleed AlrasheedParticipant | 18.1% | Pre Post 73 / 60 | Not eligible
| Not eligible | |
Lama AlmalkiSpeaker | 18.1% | Pre Post 87 / 60 | Not eligible
| Not eligible | |
Reem AlrasheedParticipant | 0.0% | Pre Post 46 / 60 | Not eligible
| Not eligible | |
Mohammed AltamimiExpert | 0.0% | Pre Post | Not eligible
| Not eligible | |
Faisal AlmalkiMedia | 0.0% | Pre Post | Not eligible
| Not eligible | |
0.0% | Pre Post 26 / 60 | Not eligible
| Not eligible | ||
0.0% | Pre Post | Not eligible
| Not eligible | ||
Alanoud AlmutairiParticipant | 0.0% | Pre Post | Not eligible
| Not eligible | |
Sarah AlotaibiParticipant | 0.0% | Pre Post 50 / 60 | Not eligible
| Not eligible | |
Omar AlsubaieParticipant | 0.0% | Pre Post 54 / 60 | Not eligible
| Not eligible |