Accepted
119
One rule, applied to issuing, downloads and the portal.
Issuing opens after the event ends on 10 December 2026. This is the eligibility so far.
Abdulrahman AlthubaitiExpert | 0.0% | Pre Post | Not eligible
| Not eligible | |
Reem AlanaziExpert | 0.0% | Pre Post | Not eligible
| Not eligible | |
Ghada AlotaibiParticipant | 0.0% | Pre Post | Not eligible
| Not eligible | |
Sultan AljuhaniSpeaker | 0.0% | Pre Post | Not eligible
| Not eligible | |
Lama AlthubaitiMedia | 0.0% | Pre Post | Not eligible
| Not eligible | |
Fahad AlsahliParticipant | 0.0% | Pre Post | Not eligible
| Not eligible | |
Reem AlyamiParticipant | 0.0% | Pre Post | Not eligible
| Not eligible | |
Huda AlthubaitiParticipant | 0.0% | Pre Post | Not eligible
| Not eligible | |
Asma AlanaziExpert | 0.0% | Pre Post | Not eligible
| Not eligible | |
0.0% | Pre Post | Not eligible
| Not eligible |