Participants see one flow. Manage the pre and post sections inside the single “Evaluation” tab. Use “Apply pre questions to post” when both phases share the same questions.
Evaluation settings
Control how the pre/post evaluation is shown, the QR mode, anonymity and when the post evaluation opens.