Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
Control how the pre/post evaluation is shown, the QR mode, anonymity and when the post evaluation opens.
Two separate forms or one flow in two steps, one QR or two, and how options of new questions are scored.
The structure is locked after the first response or the first evaluation email, unless you confirm “Change and re-send”.
Separate forms always use two separate QR codes; choose “One form with two sections” to use one shared QR.
The default for new choice questions; it decides how their scores are computed in the reports.
Who sees who answered what, how a participant gets in through the shared link, and whether evaluation emails go out.
After the first response only more protection is allowed (identified to confidential or anonymous), because respondents were promised confidentiality.
When participants can submit in each phase, in the event’s time zone.
Empty = until the event ends or the form closes.
Pre evaluation opened at: 2026-05-10 08:00 · 1447-11-23
Post evaluation opened at: 2026-05-10 16:30 · 1447-11-23
A first reminder after opening and a last one before closing, at most two per phase.
The language of the question text, and whether participants see their score in knowledge questions.
Knowledge questions only; weights and correct answers are never sent to participants.
The structure will change and the affected participants get the matching compensating emails (who received the separate pre email gets the combined or post email later).