Opening the page…
Last changed 2026-10-14 by Lama Alzahrani
The platform default template is used until one is approved for this event.
A long name shrinks to a minimum size, then wraps onto two lines.
Survey Design Workshop
22 March 2026
هيفاء عبدالله القحطاني
Haifa Abdullah Alqahtani
King Saud University
SpeakerWRK8-00042