Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
جامعة الملك سعود — فرع مكة المكرمة · KSU—M · Academic
King Saud University — Makkah branch
The rating is soft-deleted and the average updates at once. Write the reason.
King Saud University — Makkah branch will leave the default search, pickers, invitations and campaigns, and stay in reports. Its portal account will be disabled.
Delete King Saud University — Makkah branch? It can be restored within 90 days from the “Deleted” tab.
contact.makkah@ksu.edu.sa will get a one-time link valid for 72 hours, which voids any earlier link. No password is sent.
King Saud University — Makkah branch will no longer be able to sign in to the portal, and its sessions end at once.
The authority’s email contact.makkah@ksu.edu.sa gets a link to complete the chosen items; the authority stays approved.
The authority has not confirmed its data since joining. It gets a reminder with a “Review our data” link.