Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
Only the changed fields are sent and written to the history; empty optional fields are not forced.
At least one of the two names. Sector and fields drive completeness and filters.
Like “SDAIA”
Up to 10 fields
Changing the department is a transfer; you’ll be asked for a reason on save.
The official email is the portal sign-in email; duplicates are checked when you leave the field.
The short code (4 letters and 4 digits) or the full address
Like 011 xxx xxxx
One primary contact gets messages in copy. A fully empty card is ignored.
What the authority offers its partners; part of search and filters.
A valid accreditation turns “internationally accredited” on automatically.
Sensitive, encrypted data; existing values never appear in an editable field.
For Saudi Arabia, 10 digits starting with 1, 2, 4 or 7
Current: SA•• •••• •••• •••• •••• 1420
Derived from the IBAN
PDF, JPEG or PNG up to 10MB
Files are scanned before they become available, and open through a signed link.
If you leave now, the changes you haven’t saved are lost.
The portal sign-in email will change. Both the old and the new address are notified, and the authority must confirm the new one before signing in with it.