Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
The admin never types a password: the user gets a link to set one.
Name in Arabic and English, email, mobile and photo.
On the centre’s domain kaccc.org.sa.
Account type, home department and roles with their scopes. Someone limited to a department does not see “every department” or the protected roles.
Closing now loses them.