Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
Reads logs, permissions and settings; exports the log.
The name in two languages, the description, and the two-step verification rule.
Categories and their permissions. “Select all” at the top of each category.
No permission will be added and none will be removed. It applies to 1 user at their next request.