Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
Standardising registration, attendance and certificates across events.
Each task has a fixed id: renaming it keeps its experts.
Multi-select with search; assign them to tasks once linked.
Pick the tasks this expert works on inside the project.
No experts are linked. It is deleted with its tasks and the delete is written to the audit log.
The project and its experts stay readable and it leaves the linking pick lists. It can be unarchived later.