Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
Short digital content on the culture of dialogue with the centre’s experts.
Unique specializations after normalising, with the number of experts in each.
Multi-select with search; assign them to tasks once linked.
Pick the tasks this expert works on inside the project.
No experts are linked. It is deleted with its tasks and the delete is written to the audit log.
The project and its experts stay readable and it leaves the linking pick lists. It can be unarchived later.