Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
Enter the expert’s details by hand; the record is approved on save.
The full name in at least one language; the title is shown before the name, never stored in it.
Required if the Arabic name is not entered
The email is the expert’s key on the platform; duplicates are checked when you leave the field.
Free text — a sensitive field
The specialization from the approved taxonomy, and languages with their levels.
Up to 5
Up to 30 — type, then Enter
Add publications, certificates and conferences now or later from the profile.
The IBAN is checked and the bank is read from it. The current value is never shown.
SA followed by 22 digits; leave empty if not available
Filled from the IBAN
Files are scanned before they become available.
PDF or DOCX up to 10 MB
JPEG, PNG or WebP up to 2 MB
PDF, JPEG or PNG up to 5 MB
The contract count cannot be below the number of chosen projects.
The department that owns the record, and what the expert receives when added.
You have unsaved changes. Do you want to leave?