السيد راكان الدوسري · Professor @ Ministry of Media
| Source | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Tolerance Opinion Trends Study | Writing the final report | 2026-08-22 | 5/10 | 6/10 | 5/10 | 6/10 | 7/10 | 29/50 | 58% | Fair | Manual | Turki Aldosari | |
| International Cultural Communication Forum | Moderating a panel | 2026-08-02 | 7/10 | 6/10 | 8/10 | 6/10 | 6/10 | 33/50 | 66% | Fair | Manual | Eng. Abdulaziz Alrasheed | |
| Tolerance Opinion Trends Study | Data analysis | 2026-04-02 | 5/10 | 5/10 | 7/10 | 7/10 | 7/10 | 31/50 | 62% | Fair | Manual | Turki Aldosari | |
| Family Dialogue Guide | Peer review | 2026-02-17 | 7/10 | 8/10 | 6/10 | 6/10 | 5/10 | 32/50 | 64% | Fair | Manual | Eng. Abdulaziz Alrasheed | |
| Tolerance Opinion Trends Study | Data analysis | 2026-01-11 | 6/10 | 7/10 | 7/10 | 8/10 | 6/10 | 34/50 | 68% | Fair | Manual | Reem Alsubaie |