الأستاذ الدكتور نايف الخالدي · Certified trainer @ Ministry of Culture
| Source | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Tolerance Opinion Trends Study | Questionnaire design | 2026-03-03 | 8/10 | 8/10 | 6/10 | 5/10 | 6/10 | 33/50 | 66% | Fair | Manual | Lama Alzahrani | |
| «Let’s Talk» media campaign | Content writing | 2026-02-02 | 7/10 | 6/10 | 7/10 | 7/10 | 5/10 | 32/50 | 64% | Fair | From event: National Youth Dialogue Forum | Eng. Abdulaziz Alrasheed | |
| Tolerance Opinion Trends Study | Writing the final report | 2026-01-12 | 7/10 | 6/10 | 6/10 | 6/10 | 6/10 | 31/50 | 62% | Fair | Manual | Sultan Alharbi |