Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
إدارة النشر (ملغاة)
This department is archived
2 staff are recorded on it from the old system — move them with “Move records”.
Both names and the code are required; the head is picked once staff are assigned to it.
It leaves the pick lists and takes nothing new; its records and reports stay as they are, and it can be restored at any time.
It becomes active again and returns to the pick lists.
Only a department with no link at all can be deleted. These links exist now; archive it instead, or move its records first.
This department has no links. The delete cannot be undone and is written to the audit log.
It runs as a background job and reports the count for each kind. The reach of permissions tied to the department changes.