Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
إدارة الحوار المجتمعي
Both names and the code are required; the head is picked once staff are assigned to it.
It leaves the pick lists and takes nothing new; its records and reports stay as they are, and it can be restored at any time.
It becomes active again and returns to the pick lists.
Only a department with no link at all can be deleted. These links exist now; archive it instead, or move its records first.
This department has no links. The delete cannot be undone and is written to the audit log.
It runs as a background job and reports the count for each kind. The reach of permissions tied to the department changes.