جامعة الأميرة نورة بنت عبدالرحمن — فرع الرياض · Academic
Legacy rating (before Ultra Experts): 4/5 — for reference only, not averaged
| «Let’s Talk» media campaign | Reviewing media messages | 2026-08-02 | 9/10 | 6/10 | 7/10 | 7/10 | 7/10 | 36/50 | 72% | Good | Eng. Abdulaziz Alrasheed | |
| Family Dialogue Guide | Authoring a chapter | 2026-06-17 | 8/10 | 8/10 | 8/10 | 9/10 | 8/10 | 41/50 | 82% | Good | Eng. Abdulaziz Alrasheed | |
| Dialogue Events Season — Jeddah | Running a workshop | 2026-05-15 | 8/10 | 9/10 | 9/10 | 7/10 | 9/10 | 42/50 | 84% | Good | Eng. Abdulaziz Alrasheed | |
| Family Dialogue Guide | Peer review | 2026-04-12 | 8/10 | 7/10 | 7/10 | 8/10 | 9/10 | 39/50 | 78% | Good | Eng. Abdulaziz Alrasheed |