Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
جامعة الأميرة نورة بنت عبدالرحمن — فرع الرياض · Academic
Princess Nourah University — Riyadh branch will leave the default search, pickers, invitations and campaigns, and stay in reports. Its portal account will be disabled.
Delete Princess Nourah University — Riyadh branch? It can be restored within 90 days from the “Deleted” tab.
contact.riyadh@pnu.edu.sa will get a one-time link valid for 72 hours, which voids any earlier link. No password is sent.
Princess Nourah University — Riyadh branch will no longer be able to sign in to the portal, and its sessions end at once.
The authority’s email contact.riyadh@pnu.edu.sa gets a link to complete the chosen items; the authority stays approved.
The authority last confirmed its data on 2025-07-15. It gets a reminder with a “Review our data” link.