Pages
Each tour walks you through the real screens step by step, switches the demo role when needed and puts it back afterwards.
شركة بيانات المستقبل — فرع القصيم · Private
Future Data Co. — Qassim branch will leave the default search, pickers, invitations and campaigns, and stay in reports. Its portal account will be disabled.
Delete Future Data Co. — Qassim branch? It can be restored within 90 days from the “Deleted” tab.
contact.qassim@futuredata.sa will get a one-time link valid for 72 hours, which voids any earlier link. No password is sent.
Future Data Co. — Qassim branch will no longer be able to sign in to the portal, and its sessions end at once.
The authority’s email contact.qassim@futuredata.sa gets a link to complete the chosen items; the authority stays approved.
The authority has not confirmed its data since joining. It gets a reminder with a “Review our data” link.